Case Study – Brick Manhole Chambers

Substrate10 x Brick Manhole Chambers
SizeManholes all approx 600mm x 600mm at various depths, ranging from .75m to 2m deep
PurposeDrainage system on chemical plant
ConditionVarious, ranging from a very severe build up of mineral deposits to oil and grease residue and had previously been coated with an unknown material plus minor structural defects.
Repair detailsChemicals were leaking into the water table causing pollution issues with EA. A sealed system was required because the drains had recently been re-lined because a sealed system was required
PreparationWhere required the manhole was isolated using inflatable drain plugs and then high pressure power washed. Previous coating was removed using a scabbler. Mineral build up was removed using a CP9 and scabbler. The oil/grease residue was removed using acetone.
Spray1 coat at 6mm applied
Time Scaleapprox 7 days

 

Brick-Manhole-Chambers-Before

Before

 

Brick-Manhole-Chambers-After

After