Case Study – Concrete Manholes in Brisbane

Substrate

1 x Concrete Manhole used in Trunk Line Sewer, Size = 1050 dia x 2.7m deep + biscuit

Condition

The manhole was in need of repair due to severe high levels of H2S attack and erosion.

Preparation

The chamber was vented above and below the chamber on the sewer line and then an air mover was used to increase the ventilation and airflow. A high pressure power wash was followed by acid etch, wash down and then dried using the air mover.
Spray ApplicationSpraying took 1.5 hours including the preparation. 1 coat of Epoxy was applied at 6mm using approx 40 gallons of Epoxy resin

Outcome

Redlands Shire Council were impressed with the outcome, more work followed.

Before; – with the temporary pipe to protect the epoxy spray from live sewer.

 

Condition before spraying

 

Preparation finished and spraying commences

Complete Spray